Sign In | Join Free | My entremaqueros.com
China Chengdu Forster Technology Co., Ltd. logo
Chengdu Forster Technology Co., Ltd.
Integrity, pragmatism, innovation, and provide the best solution for your hydro power plant.
Active Member

6 Years

Home > Hydro Turbine Generator >

Mini Hydro Power Turbine 30kw To 250kw With Jet Turbine Engine

Chengdu Forster Technology Co., Ltd.
Contact Now

Mini Hydro Power Turbine 30kw To 250kw With Jet Turbine Engine

  • 1
  • 2
  • 3

Brand Name : Forster

Model Number : CJ237-W-55

Certification : ISO9001/CE/TUV/From-E

Place of Origin : Sichuan,China

MOQ : 1set

Price : Negotiable

Payment Terms : L/C, D/A, D/P, T/T, Western Union, MoneyGram

Supply Ability : 500 Set/Sets per month

Delivery Time : 120days

Packaging Details : wooden box

Excitation device : 5 in 1 integrated control panel

Power : 25KW to 250KW

Head : 50m to 210m

Discharge : 0.086m³/s to 0.176m³/s

Draft tube material : Carbon steel

Color : According to customer choice

Connection method : Straight league

Contact Now

Quality Mini Hydro Power Turbine 30KW With Jet Turbine Engine For Sale

Our main products included:

1. Kaplan hydro turbine generators series.

2.Turgo hydro turbine generators series,e.g. vertical type horizontal type.

3.Tubular hydro turbine generators series ,e.g. Bulb type and shaft extension type.

4. Francis hydro turbine generators series.

5. Pelton hydro turbine generators series and double turbine generators series and so on.

6. Other auxiliary equipment for hydropower station, such as generator, control panel, governor, hydroturbine control valve, transformer, automatic electrical equipment, electricity meter, pressure tube, etc

Product features:

Pelton water turbine is a hydraulic prime mover that converts water energy into mechanical energy by drawing a free jet with kinetic energy by means of a special water guiding mechanism, rushing to the runner water bucket, and rotating the runner to do work. The impact turbine is suitable for high-head, small-flow power stations. It converts water from pressure pipes into high-speed jets through nozzles, tangentially impacts the runner, and pushes the runner to rotate, thereby driving the generator rotor to generate electricity. In impact turbines, the relative positions and working times of working jets and runners can be divided into impact turbines, oblique impact turbines, and double-click turbines.

1. suitable for high head,small flow and flow changes in large runoff hydropower station.

2. With the power plant investment is small,compact units structure characteristics.

3. Has the efficiency changes smoothly,operating a wide range,even in the 15--20% load is reduced efficiency.

4. Suitable for high head,small flow station in mountainous area.

5. A unit construction,simple restrictions without cavitation condition,the advantages of stable operation,less investment,construction area.

Product parameters:

CJ237-W-55/1x6 Quality Mini Hydro Power Turbine 30KW With Jet Turbine Engine
Model Turbine Parameters Generator Parameters Driving mode Speed Way Water Intake
Design head(m) Under the design head Design speed (r/min) The power of generator Rated speed(r/min) Runaway speed(r/min) Vavel control Guide vane control Diameter (mm)
Flow rate (m3/s) The output(kw)
CJ237-W-55/1x6 50 0.086 34.2 477 26 1000 1800 Between the united manually YTT-35 250
60 0.095 45 533 40 1000 1800 Between the united manually YTT-35 250
70 0.102 56.8 576 55 600 1320 Between the united manually YTT-35 250
80 0.109 69.4 615 55 600 1320 Between the united manually YTT-35 250
90 0.116 81.7 655 75 600 1320 Between the united manually YTT-35 250
100 0.122 96.5 685 100 750 1650 Between the united manually YTT-35 250
1 10 0.128 112 720 100 750 1650 Between the united manually YTT-35 250
120 0.133 127 750 125 750 1650 Between the united manually YTT-35 250
130 0.139 142 785 125 750 1650 Between the united manually YTT-35 250
140 0.144 158 805 160 750 1350 Between the united manually YTT-35 250
150 0.149 174 835 160 750 1350 Between the united manually YTT-35 250
160 0.154 190 866 160 750 1350 Between the united manually YTT-35 250
170 0.159 212 890 200 1000 1800 Between the united manually YTT-35 250
180 0.163 232 920 200 1000 1800 Between the united manually YTT-35 250
190 0.167 253 947 250 1000 1800 Between the united manually YTT-35 250
200 0.172 275 970 250 1000 1800 Between the united manually YTT-35 250
210 0.176 296 992 250 1000 1800 Between the united manually YTT-35 250

Product pictuers:

Mini Hydro Power Turbine 30kw To 250kw With Jet Turbine Engine

Installation design drawings:

Mini Hydro Power Turbine 30kw To 250kw With Jet Turbine Engine

Company Information

Chengdu Forster Technology is focused on design and manufacturing hydro turbines. The company was founded in 1956. Forster is the first Chinese state-owned enterprise and spares no effort to expand international market in 2013,At present, we have obtained orders in many water-rich areas such as Europe, Asia, South America, North America, etc., and as partners, we are qualified as long-term suppliers in many regions.

The capacity of hydro turbines is up to 50KW-30MW for a unit. The main hydro turbines areTurgo turbine ,pelton turbines, francis turbines, kaplan turbines ,bulb tubular turbines and other types of turbines.Foster also supplies governors, valves, transformers, monitoring systems, microcomputer integrated control panels and other equipment for hydroelectric power plants.

Customer Case

Mini Hydro Power Turbine 30kw To 250kw With Jet Turbine Engine

FAQ

Q1, Which turbine should I choose?

Please tell me the water head, flow rate, frequency, Total power you need

, voltage, on grid or off grid operation, we will propose a solution.

Q2, Can your factory provide all the equipment for hydropower generation?

Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.

Q3, Can you do EPC for a hydroelectric power plant?

Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.

Q4,Is your company a trading company or a manufacturer?

We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.

Q5, What is an acceptable MOQ?

For this product, our acceptable MOQ is 1 set.

Q6,How long is the delivery time?

Delivery times range from 15 days to 6 months depending on the model you are purchasing.

Q7,Does your company have its own independent official website?

Of course, and we can see more information about our company and products on our official website.

website address: www.fstgenerator.com


Product Tags:

water turbine electric generator

      

hydro water turbine generator

      
 Mini Hydro Power Turbine 30kw To 250kw With Jet Turbine Engine Manufactures

Mini Hydro Power Turbine 30kw To 250kw With Jet Turbine Engine Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Chengdu Forster Technology Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)